DURHAM TOPSOIL & 2018 PRODUCTS & PICK UP PRICE LIST |
|
SOIL & MULCHES – per cubic yard | NET | HST | TOTAL |
TRIPLE MIX | 28.00 | 3.64 | 31.64 |
SCREENED TOPSOIL – “SALE” | 9.75 | 1.27 | 11.02 |
TOP DRESSING | 35.00 | 4.55 | 39.55 |
MANURE | 28.00 | 3.64 | 31.64 |
FOREST MULCH (pine) | 42.00 | 5.46 | 47.46 |
DYED RED WOOD CHIPS | 46.00 | 5.98 | 51.98 |
DYED BLACK WOOD CHIPS | 46.00 | 5.98 | 51.98 |
ORGANIC COMPOST | 46.00 | 5.98 | 51.98 |
PEAT LOAM | 50.00 | 6.50 | 56.50 |
NATURAL WOOD CHIPS | 20.00 | 2.60 | 22.60 |
AGGREGATES – per cubic yard |
|||
GRANULAR ‘A’ | 36.00 | 4.68 | 40.68 |
SAND | 32.00 | 4.16 | 36.16 |
LIMESTONE SCREENINGS | 33.50 | 4.36 | 37.86 |
3/8″ PEA STONE | 55.00 | 7.15 | 62.15 |
1″- 2″ NATURAL (DRAIN STONE) | 55.00 | 7.15 | 62.15 |
3″- 6″ NATURAL STONE | 55.00 | 7.15 | 62.15 |
3/4″ CLEAR LIMESTONE | 45.00 | 5.85 | 50.85 |
3/4″ CRUSHED LIMESTONE | 36.50 | 4.75 | 41.25 |
1″ – 2″ GRANITE RIVERSTONE | 110.00 | 14.30 | 124.30 |
4″ GRANITE RIVERSTONE | 110.00 | 14.30 | 124.30 |
PRODUCT SOLD BY THE BAG |
|||
Choice of the following: Triple mix, manure, organic compost, mushroom compost, peat loam, natural wood chips |
2.43 | 0.32 | 2.75 |
Choice of the following: Clear Bags: Mulches, most aggregates such as limestone screenings |
3.25 | 0.42 | 3.67 |
GRANITE RIVERSTONE: 40lbs. pre-bagged | 4.75 | .62 | 5.37 |
GRASS SEED – #1 CERTIFIED GRASS SEED |
|||
SUPER GROW MIXTURE | 7.77/kg + tax | 25 kg bag $190.00 +taxes | |
SUN & SHADE MIX | 9.76/kg + tax | 25 kg bag $238.00 +taxes | |
OVERSEEDING MIX | 8.61/kg + tax | 25 kg bag $210.00 +taxes | |
WATER SAVER (NEVADA) | 8.69/kg + tax | 25 kg bag $212.00 +taxes | |
TROPHY TURF SHADE MIXTURE | 15.00/bag 1.5 KG | ||
WHITE CLOVER | 18.50/bag 1.0 KG | ||
Cubic Yard Calculations: Multiply length (in feet) by width (in feet) by the depth of material (INCHES) you need; then divide the total by 324 to determine the number of cubic yards. For example if you want a six inch layer of topsoil on 22 X 5 foot area, you’ll need 2 cubic yards (22 X 5 X 6 = 660, divided by 324 = 2). Allow 15% extra when compacting material. Calculate each area separately, then add cubic yards together. | |||